Analyst Dojo
Lesson 4 of 5 8–12% of the exam

Measuring risk: probability, VaR, CVaR and sensitivities

Risk is measured with probabilities, standard deviation, beta for equity market risk, duration for bond interest-rate risk, the Greeks (delta, gamma, vega, rho) for derivatives, and tail measures: VaR (a minimum loss at a given probability over a period) and CVaR (the average loss beyond VaR). Scenarios and stress tests cover what statistics miss.

6 min cram, 26 min full read. Based on the 2027 CFA® Program Level I curriculum, Portfolio Construction, Learning Module 6. Also part of the 2026 curriculum, so it applies to the November 2026 exam too.

Tailor this to you: take the self-assessment

Before this: Financial and non-financial risks, and how they interact, Portfolio Risk and Return: Part II (CAPM and Performance Measures)

On the exam

  • Describe methods for measuring and modifying risk exposures and factors to consider in choosing among the methods

Describe methods for measuring risk exposures. Expect a VaR interpretation ('which statement is correct?'), a 'which measure captures X?' match, and possibly a small calculation: price change from duration, option change from delta, or the expected number of VaR breaches.

How deeply to learn each part
Know the idea
Understand it in general. It frames other topics, but you will not calculate with it.
Use it
Understand it well enough to solve a question with it. Recognize when it applies.
Memorize
Learn it by heart. The exam will not give it to you.

You know this one. The full lesson is folded away. The takeaways, formulas and checkpoint below are your quick refresher, and the checkpoint is a fair test of whether you still do.

You tested strong here. The full lesson is folded away. The takeaways, formulas and checkpoint below are your quick refresher, and the checkpoint is a fair test of whether you still know it.

Cram mode: the one-screen version of this lesson. Switch to Full for the explanations, worked examples and interactives.

One cannot modify a risk without measuring it, and the main reason to measure is to check whether the risk being taken fits the tolerance set by governance.

Where does risk come from?

Use it

Risk drivers are the fundamental underlying factors that create risk. They sit at three levels: global and domestic macroeconomies (set partly by governments and central banks through taxes, regulation and monetary and fiscal policy), industries (some stable, some highly cyclical) and individual companies.

Risk management can control some of this but not all. A risk manager may reduce the chance that the company defaults, but cannot control interest rates. The aim is to position the company so that its exposure fits its tolerance. Idiosyncratic company risk can be diversified away by an investor, yet it still matters to company management and to poorly diversified investors. Something that looks unsystematic can turn out to be systematic: poor credit risk management at a bank that is too big to fail can become a global crisis.

Which measure fits which risk?

Use it

The metrics of risk are quantitative measures of exposure. No single one fits every asset.

Which measure for which risk
Risk measuresmatch the measure to the source of risk
  • General
    • Probability Use it how likely, not how large
    • Standard deviation Use it dispersion; weak with fat tails
  • Asset-specific
    • Beta Use it equity sensitivity to the market
    • Duration Use it bond price sensitivity to rates (first order)
  • Derivatives: the Greeks
    • Delta Use it price change per small move in the underlying (first order)
    • Gamma Use it change in delta; larger moves (second order)
    • Vega Use it sensitivity to the underlying's volatility
    • Rho Use it sensitivity to interest rates
  • Tail measures
    • VaR Memorize minimum loss at a probability over a period
    • CVaR Memorize average loss beyond VaR
    • Expected loss given default Use it credit analog of CVaR
  • What-if methods
    • Scenario analysis Use it a package of stress tests with a theme
    • Stress testing Use it extreme moves that could destabilize
MeasureWhat it capturesNote
Probability How likely an outcome isObjective (a die) or subjective (chance of a rate rise). Not enough alone: a 25% chance of loss does not say how big
Standard deviation Dispersion of outcomesIn a normal distribution about 68% of outcomes lie within one standard deviation of the mean, about 95% within two and about 99% within three. Weak for non-normal distributions and fat tails
Beta Sensitivity of returns to the marketThe risk an asset adds to a well-diversified equity portfolio. Equity, not bonds
Duration Sensitivity of a bond’s price to yieldsFirst order, analogous to delta
Delta Derivative price change for a small change in the underlyingFirst order. The most important derivatives measure
Gamma How much delta changesSecond order. Captures larger moves
Vega Derivative price change for a change in the underlying’s volatilityFirst order
Rho Derivative price change for a change in interest ratesUsually small for options, except options on interest rates, where rates are the underlying

Derivatives are used to manage risk but they take on other risks. They are highly leveraged, so their risk must be measured with specialized tools.

Interest-rate and option sensitivities

For a small yield change, a bond’s price moves in the opposite direction by about duration times the yield change.

Interest-rate sensitivity (duration) Use it
%ΔP≈−D×Δy\%\Delta P \approx -D \times \Delta y
Rearrange itInterest-rate sensitivity: solve for any input
The question asks for
A bond portfolio has a duration of 7. Yields change by 0.60%. The approximate change in the portfolio's price is closest to:

−7 × 0.006 = -0.042, so -4.20%

Approximate price change-4.20%

On your calculator
  1. 7×0.006=+|-a decimal, ×100 for percent

+|- change sign

  1. 7ENTER0.006×CHSa decimal, ×100 for percent

ENTER enter (on the HP, puts the number on the stack) · CHS change sign

For a small move in the underlying, an option’s price changes by about delta times the move. Delta is limited to small moves because it changes as the underlying moves; gamma measures that change.

Option price change from delta Use it
ΔC≈δ×ΔS\Delta C \approx \delta \times \Delta S
Rearrange itOption delta: solve for any input
The question asks for
A call option has a delta of 0.6. The underlying rises by 2.00. The approximate rise in the option price is closest to:

0.6 × 2.00 = 1.20

Approximate change in the option price1.20

On your calculator
  1. 0.6×2=
  1. 0.6ENTER2×

ENTER enter (on the HP, puts the number on the stack)

How do you read a VaR?

Memorize

Value at risk (VaR) measures the size of the tail of the distribution of profits and losses. A VaR statement has three elements: an amount in currency, a time period and a probability.

A bank states a 5% one-day VaR of GBP 3 million. It expects to lose at least GBP 3 million on 5% of days, which is about one day in twenty.

The word minimum is the key. VaR says nothing about the maximum, which is the whole equity of the organization or the whole value of the portfolio. VaR is a minimum extreme loss.

Expected number of days beyond VaR Use it
N=T×pN = T \times p
Rearrange itExpected days beyond VaR: solve for any input
The question asks for
A portfolio has a 1.00% one-day VaR. Over 250 trading days, the number of days on which the loss is expected to be at least the VaR is closest to:

250 × 0.01 = 2.5

Expected days with a loss of at least VaR2.5

On your calculator
  1. 250×0.01=
  1. 250ENTER0.01×

ENTER enter (on the HP, puts the number on the stack)

InteractiveWhere the tail starts, and how bad it gets

Try this 0 of 3

  • Turn on fat tails at 95% confidence and compare VaR with CVaR.
  • Set the confidence level to 99% on a one-day horizon and count the bad days.
  • Stretch the holding period to 10 days.

95% 1-day VaR on USD 100m with daily σ 1.2%, normal returns: VaR USD 1.97m, CVaR USD 2.48m. Normal: USD 1.97m and USD 2.48m; fat tails: USD 1.81m and USD 2.72m. About 12.5 days in 250 lose more than VaR.

−6−4−20241-day profit or loss (USD m)VaR 1.97CVaR 2.48
  • Normal
  • Worst 5%

Losses are on the left. VaR marks where the shaded tail starts; CVaR is the average loss inside it.

DistributionVaRCVaRCVaR ÷ VaR
NormalUSD 1.97mUSD 2.48m1.25
Fat tailsUSD 1.81mUSD 2.72m1.50

Same standard deviation in both rows: only the shape of the tail differs.

95% 1-day VaRUSD 1.97m
CVaR (average loss beyond VaR)USD 2.48m
Expected days in 250 beyond VaR12.5
The VaR statement
The portfolio
Show working

Tail probability = 1 − 95% = 5%.

σ over 1 day = 1.2% × √1 × USD 100m = USD 1.2000m.

Normal: z = 1.6449, so VaR = 1.6449 × 1.2000 = USD 1.97m; CVaR = 1.2000 × φ(1.6449) ÷ 0.05 = 1.2000 × 0.1031 ÷ 0.05 = USD 2.48m.

Fat tails (t, 4 degrees of freedom, scaled to the same σ): quantile 2.1318 × scale 0.8485 = VaR USD 1.81m; CVaR = USD 2.72m.

Reading it: on about 12.5 days out of 250, expect a loss of at least USD 1.97m. VaR is a minimum loss in the tail, not the maximum; the average loss on those days is USD 2.48m.

The keystrokes reproduce the normal VaR. Neither calculator gives z or t quantiles: they come from a table.

Normal VaR on your calculator (USD millions)
  1. 1.6449×0.012×1√x×100=1.9739

√x square root

  1. 1.6449ENTER0.012×1g√x×100×1.9739

ENTER enter (on the HP, puts the number on the stack) · g blue shift key · √x square root

Display: 1.9739

VaR tells you where the tail starts; CVaR tells you how bad it gets.

Move the confidence level and watch the shaded tail. Turn on fat tails and the 95% VaR stays about the same, but the CVaR, the average of the shaded area, moves out. That is the gap that VaR alone hides.

CVaR and expected loss given default

Conditional VaR (CVaR) is the weighted average of all the loss outcomes that exceed the VaR. It answers: “When we are in the tail, how bad is it on average?” Its credit analog is expected loss given default : if the borrower defaults, how much do we lose on average?

The limits of VaR

VaR is simple but controversial. It is accepted by most banking regulators, but:

  • It rests on an assumed distribution and on inputs. If either is wrong the VaR is wrong, so it carries model risk. Real returns have more extreme negative outcomes than a normal distribution implies (tail risk).
  • It can give a false sense of security: a tolerable-looking VaR may hide a bad tail.
  • It says nothing about the maximum loss.

Two common-sense methods supplement it. Scenario analysis defines a set of conditions, such as a sharp rise in interest rates together with a fall in a currency, and evaluates the loss. It can be thought of as a package of stress tests with a common theme. Stress testing proposes specific, extreme price moves that would be rare but could destabilize the organization. Central banks now require major banks to stress test. Both are still exposed to model risk, but they ask the direct question: “If this happens, how are we affected?”

How do you measure credit and operational risk?

Know the idea

Market risk is the most measurable because there is plenty of data. Credit and operational events are rare for any one organization, which makes their probability hard to estimate. A firm that has never defaulted may still default.

  • Credit risk. Lenders use credit ratings but also their own analysis of liquidity (current ratio), solvency (interest coverage), profitability (return on assets) and leverage (debt to assets). Measures include the probability of default, expected loss given default, credit VaR and the chance of a rating change. Because default is rare, risk managers pool companies with similar characteristics, and read the price of a credit default swap as a market-implied cost of default.
  • Operational risk. Very hard to measure. A third party usually aggregates events across many companies and publishes the statistics.
  • Changes in accounting rules, laws, tax rates and regulation. These are driven by politics, have no real numeric measure and are judged subjectively.
Go deeper Three ways to estimate VaR

There are several ways to estimate VaR, and they can give very different answers. The parametric method assumes a distribution, often the normal, and reads the tail from its standard deviation. The historical method ranks past returns and reads off the tail. Monte Carlo simulation generates many random outcomes from a model. Computing them is outside this module.

For a feel of the parametric method with a normal distribution and a mean of about zero, VaR ≈ z × σ × value. The 95% one-tailed z is 1.645, so for a USD 100 million portfolio with a daily standard deviation of 1.2%, the one-day VaR is 1.645 × 0.012 × 100,000,000 = USD 1,974,000. Scaling to ten days multiplies by the square root of 10, giving about USD 6.24 million.

One-day VaR, then ten days
  1. 1.645×0.012×100000000= 1974000
  2. ×10√x= 6242336

√x square root

  1. 1.645ENTER0.012×100000000× 1974000
  2. 10g√x× 6242336

ENTER enter (on the HP, puts the number on the stack) · g blue shift key · √x square root

Go deeper Sensitivity versus scenario, and why VaR is paired with stress tests

A sensitivity such as duration or delta moves one factor by a small amount and reports the change. A scenario moves several factors by a lot at the same time. After the financial crisis, risk managers and regulators paired VaR with stress tests because VaR said little about the extreme outcomes that actually hurt. Extreme value theory, long used in insurance, also studies the statistics of large tail outcomes.

Memorize this

MemorizeMatch the measure to the risk

MeasureCapturesWatch for
Standard deviationdispersion of returnsfat tails, non-normal returns
Betasensitivity to the market (equity)not an interest-rate measure
Durationbond price sensitivity to yieldsnot an equity-risk measure
Deltaoption price per small move in the underlyingfirst order
Gammahow delta changes (large moves)second order
Vegaoption price per change in volatilitynot gamma
Rhooption price per change in interest ratesusually small for options
VaRminimum loss at a probability over a periodnot the maximum
CVaRaverage loss beyond VaRbetter tail picture

Memory hook Delta is the slope, gamma the bend in the slope, vega is volatility, rho is the rate. Duration is bond delta.

MemorizeReading a VaR

Memory hook VaR is where the tail starts. CVaR is how bad it gets once you are in it.

Know it cold Three parts: an amount, a period, a probability. "5% one-day VaR of GBP 3 million": on about 5% of days (1 in 20) the loss is at least GBP 3 million. Expected days = T × p. The maximum loss is the whole portfolio.

MemorizeNormal distribution coverage

RangeShare of outcomes
±1 standard deviationabout 68%
±2 standard deviationsabout 95%
±3 standard deviationsabout 99%

Memory hook 68, 95, 99: roughly two-thirds, nineteen in twenty, ninety-nine in a hundred.

MemorizeHarder to measure

Know it cold Credit and operational events are rare, so history is thin: use ratings, aggregated similar firms, market-implied prices (credit default swaps), third-party loss databases. Accounting, tax and legal changes: subjective judgment.

Which measure for which risk
Risk measuresmatch the measure to the source of risk
  • General
    • Probability Use it how likely, not how large
    • Standard deviation Use it dispersion; weak with fat tails
  • Asset-specific
    • Beta Use it equity sensitivity to the market
    • Duration Use it bond price sensitivity to rates (first order)
  • Derivatives: the Greeks
    • Delta Use it price change per small move in the underlying (first order)
    • Gamma Use it change in delta; larger moves (second order)
    • Vega Use it sensitivity to the underlying's volatility
    • Rho Use it sensitivity to interest rates
  • Tail measures
    • VaR Memorize minimum loss at a probability over a period
    • CVaR Memorize average loss beyond VaR
    • Expected loss given default Use it credit analog of CVaR
  • What-if methods
    • Scenario analysis Use it a package of stress tests with a theme
    • Stress testing Use it extreme moves that could destabilize
Interest-rate sensitivity (duration) Use it
%ΔP≈−D×Δy\%\Delta P \approx -D \times \Delta y
Quick example

Duration 4.5 and yields fall 0.80%. The price rises about 4.5 × 0.008 = 3.6%.

On your calculator
  1. 4.5×0.008+|-=+|- 0.036

+|- change sign

  1. 4.5ENTER0.008CHS×CHS 0.036

ENTER enter (on the HP, puts the number on the stack) · CHS change sign

Option price change from delta Use it
ΔC≈δ×ΔS\Delta C \approx \delta \times \Delta S
Quick example

A call with delta 0.35 and an underlying that falls 3.00. The option falls about 0.35 × 3.00 = 1.05. Gamma matters for larger moves because delta itself changes.

On your calculator
  1. 0.35×3+|-= -1.05

+|- change sign

  1. 0.35ENTER3CHS× -1.05

ENTER enter (on the HP, puts the number on the stack) · CHS change sign

Expected number of days beyond VaR Use it
N=T×pN = T \times p
Quick example

A 5% one-day VaR over 252 trading days is exceeded on about 252 × 0.05 = 12.6 days.

On your calculator
  1. 252×0.05= 12.6
  1. 252ENTER0.05× 12.6

ENTER enter (on the HP, puts the number on the stack)

How it is asked

  1. Interpret a VaR

    A fund reports a 5% one-day VaR of GBP 3 million. What does it mean?

    On about 5% of days the loss is at least GBP 3 million. Trap: "cannot lose more than".

  2. Count the breaches

    3% one-day VaR of USD 4 million over 250 trading days. How many days at least USD 4 million?

    250 × 0.03 = 7.5 days. Traps: 3 (reading 3% as 3 days) and 12.5 (using 5%).

  3. Which Greek or measure?

    Sensitivity of an option price to the volatility of the underlying?

    Vega. Trap: gamma (change in delta). Duration is bonds, beta is equity.

  4. Price change from duration

    Duration 4.4, yields up 0.25% on USD 9 million of bonds.

    −4.4 × 0.0025 = −1.1%, about USD 99,000 lost. Check the sign and the decimal.

Exam traps

  • Reading VaR as the maximum loss. It is a minimum loss at a given probability; the maximum is the entire portfolio.
  • Saying duration measures equity risk, or beta measures interest-rate risk.
  • Confusing vega (sensitivity to volatility) with gamma (change in delta).
  • Treating a small probability as a small risk. Probability says nothing about size, so pair it with a loss measure.
  • Trusting VaR alone. It depends on the assumed distribution and inputs, so it carries model risk and says nothing about how bad the tail is.
  • Mixing percent and decimal in the duration approximation: a 0.25% rise is 0.0025.

Checkpoint

6 exam-style questions. About 90 seconds each.

  1. 1A bank reports a 5% one-day VaR of GBP 2 million. This most likely means:

  2. 2Over a year of 250 trading days, a portfolio with a 2% one-day VaR of USD 1 million is expected to have losses of at least USD 1 million on approximately:

  3. 3The risk measure that captures the sensitivity of an option's price to changes in the volatility of the underlying is:

  4. 4A bond portfolio worth USD 8 million has a duration of 5.2. Yields rise by 0.30%. The approximate change in the value of the portfolio is closest to:

  5. 5A call option has a delta of 0.45. The price of the underlying rises by 4.00. The approximate rise in the option price is closest to:

  6. 6Compared with a VaR at the same probability, conditional VaR (CVaR) is the:

Key takeaways

  • Match the measure to the risk: standard deviation, beta, duration, the Greeks, VaR and CVaR.
  • VaR is a minimum loss at a probability over a period, with three parts: amount, period, probability. CVaR is the average loss beyond it.
  • Delta and duration are first-order measures; gamma is second order; vega is volatility; rho is interest rates.
  • Scenario analysis and stress testing complement VaR by asking what happens in specific extreme events.
Interest-rate sensitivity (duration) Use it
%ΔP≈−D×Δy\%\Delta P \approx -D \times \Delta y
Quick example

Duration 4.5 and yields fall 0.80%. The price rises about 4.5 × 0.008 = 3.6%.

On your calculator
  1. 4.5×0.008+|-=+|- 0.036

+|- change sign

  1. 4.5ENTER0.008CHS×CHS 0.036

ENTER enter (on the HP, puts the number on the stack) · CHS change sign

Option price change from delta Use it
ΔC≈δ×ΔS\Delta C \approx \delta \times \Delta S
Quick example

A call with delta 0.35 and an underlying that falls 3.00. The option falls about 0.35 × 3.00 = 1.05. Gamma matters for larger moves because delta itself changes.

On your calculator
  1. 0.35×3+|-= -1.05

+|- change sign

  1. 0.35ENTER3CHS× -1.05

ENTER enter (on the HP, puts the number on the stack) · CHS change sign

Expected number of days beyond VaR Use it
N=T×pN = T \times p
Quick example

A 5% one-day VaR over 252 trading days is exceeded on about 252 × 0.05 = 12.6 days.

On your calculator
  1. 252×0.05= 12.6
  1. 252ENTER0.05× 12.6

ENTER enter (on the HP, puts the number on the stack)

All Portfolio Construction formulas, every lesson

Practice exam-style questions on Introduction to Risk Management

Questions about this lesson?

Where this comes back

Questions candidates ask

What is value at risk (VaR)?

VaR is a tail measure with three elements: an amount in currency, a time period and a probability. A 5% one-day VaR of GBP 3 million means the loss is expected to be at least GBP 3 million on about 5% of days. It is a minimum extreme loss, not a maximum.

What is the difference between VaR and CVaR?

VaR marks where the tail begins: the loss reached or exceeded with a given probability. CVaR, or conditional VaR, is the weighted average of all the losses beyond that point, so it says how bad the tail is. In credit, expected loss given default is the analogous measure.

What do delta, gamma, vega and rho measure?

They are the Greeks for derivatives. Delta is the price change for a small move in the underlying, gamma is how delta changes with larger moves, vega is the sensitivity to the underlying's volatility, and rho is the sensitivity to interest rates. Delta and vega are first order, gamma is second order.

Spotted an error? Tell us and we will fix it.

  1. What risk management is, and the risk management framework
  2. Risk governance, risk tolerance and risk budgeting
  3. Financial and non-financial risks, and how they interact
  4. Measuring risk: probability, VaR, CVaR and sensitivities
  5. Modifying risk: prevention, acceptance, transfer and shifting

Ask Sensei Listen instead

Questions on Measuring risk: probability, VaR, CVaR and sensitivities

Learn with Sensei, out loud The voice tutor, in early access

Sensei teaches the lesson aloud and stops when you interrupt: "wait, why is the geometric mean lower?" It answers with the lesson's own example, then quizzes you by voice. Every account can try Sensei on one module, with one voice question.

USD 149 a month founding price (regular USD 199), kept for as long as you stay subscribed. Everything in Plus included.

In active development and improving every day. Send feedback · Plans and pricing

Analyst Dojo Plus

Your free review list holds 10 items.

Plus keeps everything you save, for USD 19 a month. To make room on the free plan, remove something from your review list.

See Plus

Lessons, checkpoints and the lesson questions in practice stay free. Compare plans