Semi-deviation measures spread only below the mean or a target B. Target version: square the shortfalls, add them, divide by n − 1 (n counts every observation), take the root. The coefficient of variation (CV), standard deviation ÷ mean, is risk per unit of return: lower is better.
Watch the lesson 16 min
The video follows this page: the same examples, then the checkpoint questions.
Before this: Range, mean absolute deviation, variance and standard deviation
On the exam
- Calculate, interpret, and evaluate semi-deviation and coefficient of variation
Calculate, interpret and evaluate semi-deviation and the coefficient of variation. Expect a target semi-deviation where dividing by n or by the number of shortfalls is a wrong option, the effect of raising the target, and a ranking of funds by CV.
How deeply to learn each part
- Know the idea
- Understand it in general. It frames other topics, but you will not calculate with it.
- Use it
- Understand it well enough to solve a question with it. Recognize when it applies.
- Memorize
- Learn it by heart. The exam will not give it to you.
You know this one. The full lesson is folded away. The takeaways, formulas and checkpoint below are your quick refresher, and the checkpoint is a fair test of whether you still do.
You tested strong here. The full lesson is folded away. The takeaways, formulas and checkpoint below are your quick refresher, and the checkpoint is a fair test of whether you still know it.
How do you measure only the bad volatility?
The standard deviation counts a surprise gain exactly like a surprise loss. Most investors do not see it that way. They worry about returns that fall short, either below the average or below a minimum they need. The semi-variance is the variance of the observations below the mean; its square root is the semi-deviation .
The reading prints this definition with n, then says both semi-deviation measures divide by n − 1 because the data are a sample, and every worked number it gives uses n − 1 with n counting all observations. Follow the question; with no instruction, use n − 1.
For the eight returns below, the mean is 0.975% and the same four months fall below it: √(18.83 ÷ 7) = 1.64% (dividing by 8 instead gives 1.53%).
Downside risk is the risk of returns falling below a level you care about, such as a minimum return needed to meet a liability. The target semi-deviation , also called the target downside deviation , measures the spread of returns below a target B. Only observations below B enter the sum, but the divisor still counts every observation (n is the total number of observations, not just those below B).
Of 8 returns, those below the target have squared shortfalls that add up to 19.21 (in %²). The target semi-deviation is closest to:
√(19.21 ÷ 7) = √2.7443 = 1.66%
Target semi-deviation, s_Target1.66%
- 19.21÷(8−1)=√xn counts every observation, not only those below the target
√x square root
- 19.21ENTER8ENTER1−÷g√xn counts every observation, not only those below the target
ENTER enter (on the HP, puts the number on the stack) · g blue shift key · √x square root
Try this 0 of 2
- Set the target to 0% and check the target semi-deviation is 1.04%
- Raise the target to 3% or more and watch the target semi-deviation
Drag the dashed target line, or focus it and use the arrow keys. Orange months are below the target; the number under each is its squared shortfall.
4 months fall below 1.0%. Their squared shortfalls add to 19.21; divided by n − 1 = 7, the root is 1.66%, below the full standard deviation of 2.26%.
Show working
Shortfalls below B = 1.0%: Feb (−2.4 − 1.0)² = 11.56; Apr (0.5 − 1.0)² = 0.25; May (−1.2 − 1.0)² = 4.84; Aug (−0.6 − 1.0)² = 2.56.
Months at or above the target count as zero; they still count in n.
Target semi-deviation = √(19.21 ÷ (8 − 1)) = √2.7443 = 1.66%.
Traps: dividing by n = 8 gives √(19.21 ÷ 8) = 1.55%; dividing by the 4 months below target gives √(19.21 ÷ 4) = 2.19%.
Full sample standard deviation (mean 0.98%, all 8 months, ÷ 7) = 2.26%.
- 3.4x²+0.5x²+2.2x²+1.6x²=19.21, sum of squared shortfalls
- ÷7=2.7443
- √x1.66%
x² square · √x square root
- 3.4ENTER×0.5ENTER×+2.2ENTER×+1.6ENTER×+19.21, sum of squared shortfalls
- 7÷2.7443
- g√x1.66%
ENTER enter (on the HP, puts the number on the stack) · g blue shift key · √x square root
Drag the target line and watch the bars that turn orange. More bars fall short as the target rises, and each shortfall grows.
Semi-variance (measured from the mean) is always lower than the variance of the same data, so the two cannot be compared directly: compare semi-deviation with semi-deviation.
With a target near the average, the downside deviation is usually lower than the standard deviation, because only part of the data counts. Raise the target far enough and it can exceed it.
What is the coefficient of variation?
Standard deviations are hard to compare across assets with very different average returns. A 10% standard deviation is mild for an asset that earns 20% and wild for one that earns 2%. The coefficient of variation (CV) fixes this by expressing the standard deviation relative to the mean. It is a measure of relative dispersion .
A fund has a mean return of 9.00% and a standard deviation of 14.00%. Its coefficient of variation is closest to:
14.00% ÷ 9.00% = 1.5556
Coefficient of variation, CV1.5556
- 14÷9=both in percent, so the units cancel
- 14ENTER9÷both in percent, so the units cancel
ENTER enter (on the HP, puts the number on the stack)
Turned upside down, mean ÷ standard deviation is the return per unit of risk, sometimes called the unit price of risk . Computed on excess returns (returns minus the risk-free rate), it compares the reward for risk across assets, the idea behind the Sharpe ratio in Portfolio Construction.
Two cases break the CV. If the mean (or the mean excess return) is negative, the ratio is hard to interpret. And daily or weekly data have tiny means and comparatively large standard deviations, so their CVs are huge and unstable; annualize the mean and the standard deviation first (lesson 7).
- Standard deviation Memorize all spread around the mean, up and down alike
- Semi-deviation Know the idea only observations below the mean
- Target semi-deviation Memorize only shortfalls below a target B
- Divisor n − 1, with n counting every observation
- Higher target more and larger shortfalls, larger result
-
- Coefficient of variation Memorize standard deviation ÷ mean, a relative measure
- Reading it risk per unit of return, lower is better
- Inverse return per unit of risk
- Caution negative mean or high-frequency data: annualize first or avoid
-
Exam tip CV: lower is better. If a mean is zero or negative, do not use the CV at all.
Go deeper From downside deviation to the Sortino ratio
The Sortino ratio is the Sharpe ratio’s cousin: it divides the excess return over a target by the target downside deviation instead of by the standard deviation. It rewards a manager whose volatility comes mostly from gains. It appears in the performance measures of Portfolio Construction, and this lesson supplies its denominator.
Go deeper Why investors with a minimum return watch the downside
A pension fund that must earn at least 3% a year to pay benefits is not troubled by returns above 3%. Its pain comes from the months and years below that line. A manager with big upside swings and few shortfalls can have a high standard deviation but a low downside deviation, and the second number is the one that matches the fund’s problem.
Memorize this
MemorizeSemi-deviation and CV
| Measure | Formula | Better when |
|---|---|---|
| Semi-deviation | below the mean only | lower |
| Target semi-deviation | √[ Σ(X − B)² for X ≤ B ÷ (n − 1) ] | lower |
| Coefficient of variation | s ÷ X̄ | lower |
| Unit price of risk | X̄ ÷ s | higher |
Memory hook Downside deviation: keep only the bad months, square the misses, but divide by all n − 1, not by how many were bad.
Know it cold n counts every observation. Raise B and the target semi-deviation rises. CV is unit-free; with a negative mean or daily data, do not trust it raw.
- Standard deviation Memorize all spread around the mean, up and down alike
- Semi-deviation Know the idea only observations below the mean
- Target semi-deviation Memorize only shortfalls below a target B
- Divisor n − 1, with n counting every observation
- Higher target more and larger shortfalls, larger result
-
- Coefficient of variation Memorize standard deviation ÷ mean, a relative measure
- Reading it risk per unit of return, lower is better
- Inverse return per unit of risk
- Caution negative mean or high-frequency data: annualize first or avoid
-
Quick example
Returns 1%, 3%, 5%, 7% (mean 4). Below the mean: 1 and 3, squared distances 9 + 1 = 10. Divided by n = 4 as printed: 2.5 (%²). Most questions divide by n − 1 = 3 instead: 3.33.
- 10÷4= 2.5
- 10÷3= 3.3333
- 10ENTER4÷ 2.5
- 10ENTER3÷ 3.3333
ENTER enter (on the HP, puts the number on the stack)
Quick example
Returns 1%, −2%, 4%, −5%, 3% and a 0% target. Shortfalls −2 and −5: (4 + 25) ÷ (5 − 1) = 7.25, and √7.25 = 2.69%.
- 2x²+5x²= 29
- ÷4=√x 2.69
x² square · √x square root
- 2ENTER×5ENTER×+ 29
- 4÷g√x 2.69
ENTER enter (on the HP, puts the number on the stack) · g blue shift key · √x square root
Quick example
Mean 8%, standard deviation 10%. CV = 10 ÷ 8 = 1.25 units of risk per unit of return.
- 10÷8= 1.25
- 10ENTER8÷ 1.25
ENTER enter (on the HP, puts the number on the stack)
How it is asked
-
Target semi-deviation from a short list
Returns 1%, −2%, 4%, −5%, 3%, target 0%. Target semi-deviation?
(4 + 25) ÷ 4 = 7.25, √ = 2.69%. Traps: 3.81% (÷ 2 below-target values), 3.70% (full standard deviation).
-
Which fund has less risk per unit of return?
X: mean 5%, s 8%. Y: mean 15%, s 21%.
CV X = 1.60, CV Y = 1.40. Y wins. Trap: picking the lower standard deviation.
-
Rank by CV
P 5% / 3.6%, Q 8% / 5.2%, R 10% / 7.5%. Best risk-to-return?
CVs 0.72, 0.65, 0.75: Q. Traps: P (lowest standard deviation), R (highest mean).
-
Effect of raising the target
The target return is raised. What happens to the target semi-deviation?
It increases (shortfalls get bigger, more observations count).
Exam traps
- Dividing by the number of below-target observations instead of n − 1 (n counts every observation).
- Including above-target observations in the sum.
- Reading a higher CV as better. A lower CV means less risk per unit of return.
- Computing the CV when the mean (or mean excess return) is near zero or negative, or on raw daily data. Annualize first, or do not use it.
- Dividing by n instead of n − 1 for a sample semi-deviation.
- Comparing one fund's semi-deviation with another fund's standard deviation.
Checkpoint
5 exam-style questions. About 90 seconds each.
1Five annual returns are 3%, −1%, 2%, −4% and 5%. With a target of 0%, the target downside deviation is closest to:
2Fund X has a mean return of 6% and a standard deviation of 9%. Fund Y has a mean of 10% and a standard deviation of 12%. Which has less risk per unit of return?
3If the target return used in a downside deviation is raised, the downside deviation most likely:
4Ten monthly returns include three that fall below the target, with squared shortfalls that add up to 12.6 (%²). The target downside deviation is closest to:
5Three funds have the following mean returns and standard deviations: Fund L 4% and 3.4%; Fund M 9% and 7.2%; Fund N 15% and 13.5%. Which fund offers the best balance of risk and return?
Key takeaways
- Target semi-deviation: shortfalls below B only, divided by n − 1.
- CV = s ÷ mean. Lower means less risk per unit of return.
- A higher target means a larger target semi-deviation.
- CV has no units, so it compares funds of different size and return.
- Mean ÷ standard deviation (the inverse of CV) is return per unit of risk: higher is better.
Quick example
Returns 1%, 3%, 5%, 7% (mean 4). Below the mean: 1 and 3, squared distances 9 + 1 = 10. Divided by n = 4 as printed: 2.5 (%²). Most questions divide by n − 1 = 3 instead: 3.33.
- 10÷4= 2.5
- 10÷3= 3.3333
- 10ENTER4÷ 2.5
- 10ENTER3÷ 3.3333
ENTER enter (on the HP, puts the number on the stack)
Quick example
Returns 1%, −2%, 4%, −5%, 3% and a 0% target. Shortfalls −2 and −5: (4 + 25) ÷ (5 − 1) = 7.25, and √7.25 = 2.69%.
- 2x²+5x²= 29
- ÷4=√x 2.69
x² square · √x square root
- 2ENTER×5ENTER×+ 29
- 4÷g√x 2.69
ENTER enter (on the HP, puts the number on the stack) · g blue shift key · √x square root
Quick example
Mean 8%, standard deviation 10%. CV = 10 ÷ 8 = 1.25 units of risk per unit of return.
- 10÷8= 1.25
- 10ENTER8÷ 1.25
ENTER enter (on the HP, puts the number on the stack)
All Quantitative Methods formulas, every lesson
Practice exam-style questions on Statistical Characteristics of Asset Returns
Questions about this lesson?
Where this comes back
- Portfolio Risk and Return: Part II (CAPM and Performance Measures) Portfolio Construction
- Skewness and kurtosis Statistical Characteristics of Asset Returns
Questions candidates ask
What is target semi-deviation?
Another name for target downside deviation. It measures the spread of returns below a chosen target B and ignores everything above it. Square each shortfall (X − B for X below B), add them, divide by n − 1 where n counts all observations, and take the square root.
How do you calculate the coefficient of variation?
Divide the standard deviation by the mean: CV = s ÷ X̄. A fund with a 9% standard deviation and a 7% mean has a CV of 1.29. It expresses risk per unit of return and has no units, which is why it can compare assets with different average returns.
Is a higher coefficient of variation better?
No. A higher CV means more risk for each unit of return, so a lower CV is better. It only makes sense when the mean is positive and not close to zero, because a tiny mean inflates the ratio.
What is the inverse of the coefficient of variation?
Mean ÷ standard deviation: the return earned per unit of risk, sometimes called the unit price of risk. Higher is better. Using excess returns over the risk-free rate turns it into a Sharpe-style comparison across assets.