Value at risk from the normal distribution
Value at risk (VaR) is a loss that will be exceeded only with a small probability over a set horizon. With normal returns and a zero mean, VaR = Z × σ × P, using a one-tailed Z of 1.645 at 95% and 2.33 at 99%. It is a threshold, not the maximum loss.
Before this: Confidence intervals for a mean return
On the exam
- Explain the central limit theorem and the application of confidence intervals and sampling methodologies
Explain value at risk as an application of confidence intervals and calculate parametric VaR. Expect Z × σ × P with Z given (options built on 1.645, 2.33 and 2.576 or 1.96), the correct reading ('a 1% chance the loss exceeds…'), and the method's limitations.
How deeply to learn each part
- Know the idea
- Understand it in general. It frames other topics, but you will not calculate with it.
- Use it
- Understand it well enough to solve a question with it. Recognize when it applies.
- Memorize
- Learn it by heart. The exam will not give it to you.
You know this one. The full lesson is folded away. The takeaways, formulas and checkpoint below are your quick refresher, and the checkpoint is a fair test of whether you still do.
You tested strong here. The full lesson is folded away. The takeaways, formulas and checkpoint below are your quick refresher, and the checkpoint is a fair test of whether you still know it.
VaR is a one-sided confidence interval
Value at risk (VaR) is the lower bound of a one-sided confidence interval for the change in value: a loss that will be exceeded only with a small probability over a stated horizon.
There are two ways to state it. As a percentage: a one-day 95% VaR of 2% means a 5% chance of losing more than 2% of the value in one day. As an amount: a one-month 99% VaR of EUR 2.8 million means a 1% chance of losing more than EUR 2.8 million in a month. Every VaR has three parts: an amount or percentage, a horizon and a confidence level.
It is one-sided because a risk manager cares about the loss tail only, so all of α sits in the left tail.
The parametric formula
Memorize
The parametric variance–covariance method assumes returns are normal and describes them with the standard deviation. Under the zero-mean assumption , which is common practice, especially over short horizons, the formula is:
Z is the one-tailed critical value for the confidence level, σ is the standard deviation of returns over the VaR horizon and P is the current value of the position. Match σ to the horizon: daily σ for one-day VaR, monthly σ for one-month VaR.
| Confidence | One-tailed Z | Chance of a bigger loss |
|---|---|---|
| 95% | 1.645 | 5% |
| 99% | 2.33 | 1% |
These are one-tailed values: all of α is in the loss tail. 1.96 and 2.576 are the two-sided values used for confidence intervals.
A position is worth 25,000,000. Its returns over the horizon are approximately normal with a mean of zero and a standard deviation of 4.8%. Using a one-tailed Z of 2.33, the value at risk is closest to:
2.33 × 0.048 × 25,000,000 = 2,796,000
Value at risk, VaR2,796,000.00
- 2.33×0.048×25000000=
- 2.33ENTER0.048×25000000×
ENTER enter (on the HP, puts the number on the stack)
Try this 0 of 3
- Find the 95% VaR of the worked example.
- Switch on the two-sided Z and compare.
- Double σ and watch VaR.
Position EUR 25,000,000, σ 4.8% over the horizon, 99% confidence: VaR = 2.33 × 4.8% × EUR 25,000,000 = EUR 2,796,000, a 1% chance of losing more. VaR is a threshold in the loss tail, not the maximum loss.
- Losses bigger than VaR (1% chance)
Left of zero are losses. VaR marks where the worst tail starts; losses in the tail can be far bigger.
Show working
VaR = Z × σ × P = 2.33 × 0.048 × 25,000,000 = EUR 2,796,000.
As a share of the position: 2.33 × 4.8% = 11.18%.
Reading: a 1% chance of losing more than EUR 2,796,000 over the horizon, and a 99% chance the loss stays at or below it. It is not the most the position can lose.
Z is one-tailed: all of α (1%) sits in the loss tail. The mean return is assumed to be zero, and σ must match the VaR horizon.
- 2.33×0.048×25000000=2,796,000
- 2.33ENTER0.048×25000000×2,796,000
ENTER enter (on the HP, puts the number on the stack)
Display: 2,796,000
Switch between 95% and 99%, then turn on the two-sided Z to see how far the common slip moves the threshold.
Three ways to estimate VaR
- Parametric variance–covariance Use it assumes normal returns; this lesson
- Historical simulation Know the idea replays past returns; Learning Module 9
- Monte Carlo simulation Know the idea simulates many random paths; Learning Module 9
This lesson computes only the parametric version. Historical simulation and Monte Carlo simulation VaR are built in Learning Module 9.
What does the formula leave out?
Use it
The limitations of parametric VaR all come from its assumptions.
- Normality Use it real returns have skew and fat tails, so extreme losses are understated
- Same distribution at every horizon Use it return behavior can change with the horizon
- History Use it parameters from the past may not fit an unprecedented market
- Linearity Use it options and embedded options respond non-linearly
- Normality. Fat tails make large losses more frequent than the normal curve says, so VaR is understated.
- One distribution at every horizon. The shape of returns can differ between a day and a year.
- Reliance on history. A calm history understates the risk of a crisis nobody has seen.
- Linearity. An option’s value does not move in proportion to its underlying, so Z × σ × P misstates its risk.
Exam tip VaR is a threshold in the loss tail, never the worst case. Read “99% VaR of X” as “a 1% chance of losing more than X”.
Go deeper VaR in risk management
Parametric VaR is one tool in a risk manager’s kit. The risk-management lesson on VaR, conditional VaR and sensitivities places it beside measures that describe what happens beyond the threshold, which VaR itself does not. No new formulas are needed here.
Memorize this
MemorizeParametric value at risk
| Confidence | One-tailed Z | Chance of a bigger loss |
|---|---|---|
| 95% | 1.645 | 5% |
| 99% | 2.33 | 1% |
Memory hook VaR uses one tail: 1.645 and 2.33. The two-tailed pair 1.96 and 2.576 belongs to confidence intervals.
Know it cold , zero mean, σ for the same horizon. VaR is a threshold, not the maximum loss.
- Parametric variance–covariance Use it assumes normal returns; this lesson
- Historical simulation Know the idea replays past returns; Learning Module 9
- Monte Carlo simulation Know the idea simulates many random paths; Learning Module 9
- Normality Use it real returns have skew and fat tails, so extreme losses are understated
- Same distribution at every horizon Use it return behavior can change with the horizon
- History Use it parameters from the past may not fit an unprecedented market
- Linearity Use it options and embedded options respond non-linearly
Quick example
USD 4 million portfolio, daily σ 1.5%, 95%: 1.645 × 0.015 × 4,000,000 = USD 98,700. A 5% chance of losing more than that in one day.
- 1.645×0.015×4000000= 98,700
- 1.645ENTER0.015×4000000× 98,700
ENTER enter (on the HP, puts the number on the stack)
How it is asked
-
Compute VaR with Z given
GBP 12 million, monthly σ 2.8%, 95% (Z 1.645).
1.645 × 0.028 × 12,000,000 = GBP 552,720. Traps: 658,560 (1.96), 782,880 (2.33).
-
Interpret a VaR figure
One-day 95% VaR of AUD 8 million.
A 5% chance of losing more than AUD 8 million in a day. Trap: "the most it can lose".
-
Spot a limitation
Portfolio mostly made of options.
Linearity fails: parametric VaR is least reliable.
-
Which method?
VaR computed from the standard deviation and a normal Z-value.
Parametric (variance–covariance). Historical simulation replays past returns; Monte Carlo simulates them.
Exam traps
- Calling VaR the maximum possible loss. Losses beyond it happen with probability α.
- Using the two-sided Z (1.96 or 2.576) for VaR. VaR is one-tailed: 1.645 at 95%, 2.33 at 99%.
- Mixing horizons: a monthly σ gives a monthly VaR, not a daily one.
- Trusting parametric VaR for option-heavy or fat-tailed portfolios.
Checkpoint
3 exam-style questions. About 90 seconds each.
1A portfolio is worth CHF 15 million. Its monthly returns are approximately normal with a mean of zero and a standard deviation of 3.6%. Using a one-tailed Z of 1.645, the one-month 95% value at risk is closest to:
2A fund's one-day 99% value at risk is JPY 50 million. Which statement is most accurate?
3Parametric value at risk is least reliable for a portfolio made up mainly of:
Key takeaways
- VaR is a one-sided lower bound: a loss exceeded only with probability α.
- Parametric VaR = Z × σ × P with one-tailed Z: 1.645 at 95%, 2.33 at 99%.
- It assumes normal returns, a zero mean, stable parameters and linear exposures.
- Historical simulation and Monte Carlo VaR come in Learning Module 9.
Quick example
USD 4 million portfolio, daily σ 1.5%, 95%: 1.645 × 0.015 × 4,000,000 = USD 98,700. A 5% chance of losing more than that in one day.
- 1.645×0.015×4000000= 98,700
- 1.645ENTER0.015×4000000× 98,700
ENTER enter (on the HP, puts the number on the stack)
All Quantitative Methods formulas, every lesson
Practice exam-style questions on Estimation and Hypothesis Testing
Questions about this lesson?
Where this comes back
- Simulating Prices and Returns Quantitative Methods
- Measuring risk: probability, VaR, CVaR and sensitivities Introduction to Risk Management
Questions candidates ask
How do you calculate parametric VaR?
Multiply the one-tailed Z-value for the confidence level by the standard deviation of returns over the horizon and by the position's value: VaR = Z × σ × P. For EUR 25 million, monthly σ 4.8% and 99% (Z 2.33), the one-month VaR is EUR 2,796,000.
What does a 95% one-day VaR of USD 1 million mean?
There is a 5% chance of losing more than USD 1 million in one day, and a 95% chance the loss stays at or below it. It is not the most the portfolio can lose.
Why is the mean return set to zero in parametric VaR?
Over short horizons the expected return is tiny next to the standard deviation, so assuming a zero mean is common practice and keeps the formula to Z × σ × P. It also makes the estimate slightly conservative when the true mean is positive.
Spotted an error? Tell us and we will fix it.